April 2012 - Video update |
 |
April 2012 - Video update |
 |
|
 |
|
 |
| April 2012 - Prefabricated ensuite pipework |
 |
April 2012 - Construction of ensuite timber studding |
 |
April 2012 - Timber roof structure |
 |
|
 |
|
|
| April 2012 - First floor central core area |
|
April 2012 - View of front elevation |
 |
March 2012 - video update |
 |
|
 |
|
 |
| March 2012 - Lift shaft |
 |
March 2012 - Central core rear facade |
|
March 2012 - Erection of ensuite studwork walls |
 |
|
 |
|
|
| March 2012 - Lower ground floor and Ground floor elevation |
 |
March 2012 - View of bridge leading to the ground floor main entrance |
 |
February 2012 - video update |
 |
|
 |
|
 |
| February 2012 - Construction of ground floor internal walls |
 |
February 2012 - Fire escape stairwell |
 |
February 2012 - Ground floor of what will be the main entrance area |
 |
|
|
|
 |
| February 2012 - Bridge/Main Entrance reinforcement structure |
 |
January 2012 - video update |
|
January 2012 - New bin store, 1.8m high fencing yet to be erected |
 |
|
 |
|
 |
| January 2012 - PCC plank lifted into place on staircase landing |
 |
January 2012 - Precast Concrete (PCC) staircase to be lifted into place |
|
January 2012 - External brickwork walling complete to the basement |
 |
|
 |
|
|
| January 2012 - Insulation to external walls |
|
January 2012 - Retaining structure reinforcement for main entrance bridge |
 |
December 2011- video update |
 |
|
 |
|
 |
| December 2011 - Erection of steelwork in central core area. |
 |
December 2011 - Lower ground floor blockwork approaching ground floor level. |
|
December 2011 - Blockwork walls well under construction in the basement. |
 |
|
|
|
 |
| December 2011 - Works commenced on the service yard area. |
 |
November 2011 - Video Update. |
|
November 2011 - Tower crane in position to lift heavy materials and equipment around the tight site. |
 |
|
 |
|
 |
| November 2011 - Constructed reinforced concrete basement walls. |
|
November 2011 - Basement walls being tanked to protect against damp/water ingress. |
 |
November 2011 - Precast concrete planks to be lifted into position. |
 |
|
 |
|
|
| November 2011 - Construction of the lower ground floor brick/blockwork. |
 |
November 2011 - Lift pit fully formed. |
|
October 2011 - Video update. |
 |
|
 |
|
 |
| October 2011 - Reinforced |
|
October 2011 - Reinforced |
 |
October 2011 - Reinforced |
 |
|
 |
|
 |
| October 2011 - Reinforced concrete retaining wall - DPC membrane protection. |
 |
October 2011 - Reinforced |
|
October 2011 - Reinforced |
 |
|
 |
|
 |
| September 2011 - Strip foundation excavations to Phase 1 footprint. |
 |
September 2011 - Service Yard retaining wall reinforcement. |
 |
September 2011 - Soakaway drainage crates for surface water run-off. |
 |
|
 |
|
 |
| September 2011 - Foul & surface water drainage excavations to perimeter of new building. |
 |
September 2011 - Reinforcement to Service Yard Retaining Wall. |
 |
September 2011 - Bulk excavation & reduced level dig to Phase 1 footprint. |
 |
|
 |
|
 |
| August 2011 - New Road/Works access and car park being constructed. |
 |
August 2011- Pipes to be laid underground. |
 |
|
 |
|
 |
| August 2011 - Excavating machine proceeding with groundworks. |
 |
August 2011 - Fence hoarding – temporary site boundary. |