Construction Progress

     
    April 2012 - Video update April 2012 - Video update
   
April 2012 - Prefabricated ensuite pipework April 2012 - Construction of ensuite timber studding April 2012 - Timber roof structure
   
April 2012 - First floor central core area   April 2012 - View of front elevation March 2012 - video update
   
March 2012 - Lift shaft March 2012 - Central core rear facade   March 2012 - Erection of ensuite studwork walls
   
March 2012 - Lower ground floor and Ground floor elevation March 2012 - View of bridge leading to the ground floor main entrance February 2012 - video update
   
February 2012 - Construction of ground floor internal walls February 2012 - Fire escape stairwell February 2012 - Ground floor of what will be the main entrance area
   
February 2012 - Bridge/Main Entrance reinforcement structure January 2012 - video update   January 2012 - New bin store, 1.8m high fencing yet to be erected
   
January 2012 - PCC plank lifted into place on staircase landing January 2012 - Precast Concrete (PCC) staircase to be lifted into place   January 2012 - External brickwork walling complete to the basement
   
January 2012 - Insulation to external walls   January 2012 - Retaining structure reinforcement for main entrance bridge December 2011- video update
   
December 2011 - Erection of steelwork in central core area. December 2011 - Lower ground floor blockwork approaching ground floor level.   December 2011 - Blockwork walls well under construction in the basement.
   
December 2011 - Works commenced on the service yard area. November 2011 - Video Update.   November 2011 - Tower crane in position to lift heavy materials and equipment around the tight site.
   
November 2011 - Constructed reinforced concrete basement walls.   November 2011 - Basement walls being tanked to protect against damp/water ingress. November 2011 - Precast concrete planks to be lifted into position.
   
November 2011 - Construction of the lower ground floor brick/blockwork. November 2011 - Lift pit fully formed.   October 2011 - Video update.
   
October 2011 - Reinforced   October 2011 - Reinforced October 2011 - Reinforced
   
October 2011 - Reinforced concrete retaining wall - DPC membrane protection. October 2011 - Reinforced   October 2011 - Reinforced
   
September 2011 - Strip foundation excavations to Phase 1 footprint. September 2011 - Service Yard retaining wall reinforcement. September 2011 - Soakaway drainage crates for surface water run-off.
   
September 2011 - Foul & surface water drainage excavations to perimeter of new building. September 2011 - Reinforcement to Service Yard Retaining Wall. September 2011 - Bulk excavation & reduced level dig to Phase 1 footprint.
   
August 2011 - New Road/Works access and car park being constructed. August 2011- Pipes to be laid underground.
   
August 2011 - Excavating machine proceeding with groundworks. August 2011 - Fence hoarding – temporary site boundary.